Modification work in progress
Dec 30th, 2007 by admin
I dug out two of my favorite figure-hugging spaghetti-strapped tops from my wardrobe recently. I was once really really skinny and only God knows how i squeezed into them last time. What you see here is knitted with rows and rows of cables. There’s another in pink knitted in two-knits-two-purls. The shop helped me matched the green top with a matching Green Lily Yarn in a kaleidoscope of rainbow highlights.
The modification is done in crochet. The same goes for the pink top. And no, i’m not wasting my time with these two tops. Left it with the shop and they will get it done for me. They are way faster, lol. I’d rather concentrate on my new knitting and crochet projects for this coming Chinese New Year. So, are you going to knit or crochet something for Chinese New Year too? Or would you rather buy?
